The Town’s waterline project continues to make progress. Crews are working on tie-ins to the new line and pavement restoration on N. Main Street between Cook Street and Highway 49. New water lines have also been installed from North Drive to Highway 49 along N. Main Street, as well as the western section of Crestwood Drive at the White Owl Antique Mall. Waterline is currently being installed on Highway 49 between Main Street and Highway 73. The waterline installation on Empire Drive was delayed several weeks. A new installation date has not be provided by the contractor yet. Waterline installation on Highway 73 (Franklin Street) will begin in July.