Park Project Updates Jan 20
January 20, 2023
Old Castle has been secured as the concrete block vendor. Concrete block has been delivered, and walls are going up!
Site Contractor doing water/sewer work: material has been ordered. They should begin work end of next week or around January 23.
Duke Energy: has trenched from new power pole down to the blue electrical building.
Electrical Panel – after being on back order for a few months, panels are on the way and should arrive next week.
Decorative Lighting: Staff working with Duke Energy/Pike Electrical on installation of lights. Contract has been issued.
New Connecting Sidewalks around the Park will be installed after the water/sewer projects have been completed.