Big Plans for Mount Pleasant are Underway.

  • Old Castle has been secured as the concrete block vendor. Concrete block has been delivered, and walls are going up!
  • Site Contractor doing water/sewer work: material has been ordered. They should begin work end of next week or around January 23.
  • Duke Energy: has trenched from new power pole down to the blue electrical building. 
  • Electrical Panel – after being on back order for a few months, panels are on the way and should arrive next week. 
  • Decorative Lighting: Staff working with Duke Energy/Pike Electrical on installation of lights. Contract has been issued.
  • New Connecting Sidewalks around the Park will be installed after the water/sewer projects have been completed.