Utility contractors have been working since September on replacement of old clay sewer lines and manholes on C Street, Wade Street, Reid Street, A Street, and B Street. The final leg of sewer line is being completed on B Street with manhole replacement at the intersection of E. Franklin Street (Hwy. 73) scheduled for the week of January 13. As with the other manhole replacement/tie-ins, there will be a lane shift on Highway 73 while the work is being done. Following completion of the sewer line/manhole work, C Street, Wade Street, Reid Street, A Street, and the Town portion of B Street will all be paved.